Product
Detail |
|
Product
Name: |
Guidelines for Bank Stabilization Projects |
Product
Phone: |
206-477-4833 |
Description:
|
These guidelines have been developed to assist scientists and engineers with the design of bank stabilization projects for river and streambank protection in Western Washington. This document includes several types of methods that use various materials such as rock, logs, soil, plants and natural fabrics to create a complex matrix that join with the native bank materials to provide erosion protection. |
Instructions:
|
Copies of this publication are available for purchase by calling 206-296-6519. Other publications are listed on-line at: https://www.kingcounty.gov/environment/dnrp/publications.aspx |
Cost:
|
$10.65 |
Cost
Description: |
If a Washington resident add Tax of $.94. Shipping cost is $3.00 |
Group
Name: |
DNRP/WLRD - River and Floodplain Management Section (RFMS) |
Contact
Name: |
Jeanne Stypula |
Contact
Phone: |
206-477-4833 |
Contact
Fax: |
206-296-0192 |
Contact
Mail Stop: |
KSC-NR-5600 |
Web
Link: |
https://www.kingcounty.gov/environment/waterandland/flooding/bank-stabilization-projects/guidelines.aspx |
Keywords:
|
Bank stabilization |
|
|
King County Employees that provide
this Product |
Emp Name |
Phone |
Stypula , Jeanne |
206-477-4833
|
To Top ˆ |
|
Places
to Find this Product |
Place Name |
Phone |
King Street Center |
|
To Top ˆ |
|